Hilton Hotels & Resorts

7930 Jones Branch Drive, McLean, VA 22102, USA

Project Started In: 07/08/2024
Project Finished In: 15/08/2024

Information about the Project

Type of Services:

  • Renovation & Modernization
  • HVAC System Upgrade
  • Energy-Efficient Lighting Installation
  • Interior Design & Finishing

 

Scope of Work: Golfar was contracted by Hilton Hotels & Resorts to execute a comprehensive renovation of their building. The project aimed to modernize the building’s interior, enhance energy efficiency through HVAC and lighting upgrades, and elevate the overall design to reflect Hilton’s luxury standards. The scope of work included:

  • Renovating common areas, including lobbies, corridors, and restrooms, to create a modern and inviting environment.
  • Upgrading the HVAC system with energy-efficient units to improve air quality and reduce operational costs.
  • Installing LED lighting throughout the building to promote a sustainable and vibrant atmosphere.
  • Redesigning office spaces to enhance functionality and aesthetic appeal, aligning with Hilton’s high standards.

 

Challenges:

  • Maintaining Operations: Ensuring the building remained fully operational during the renovation required careful planning and scheduling to minimize disruption for Hilton’s staff and guests.
  • Brand Consistency: Aligning the renovations with Hilton’s luxury brand standards demanded meticulous attention to detail and high-quality material selection.
  • Infrastructure Integration: Integrating modern HVAC and lighting systems into the existing structure without compromising its integrity presented a significant challenge.

 

Key Highlights:

  • On-Time Completion: Golfar completed the renovation on schedule, adhering to the agreed-upon timeframe.
  • Energy Efficiency: The new HVAC and LED lighting systems achieved a 20% reduction in energy consumption, supporting Hilton’s sustainability goals.
  • Design Excellence: The modernized interiors met Hilton’s high standards for luxury and comfort, receiving positive feedback from staff and visitors.
  • Seamless Execution: Despite the challenges of working in an occupied building, the renovation was executed with minimal disruption, maintaining a high level of quality.

Joe Kessler

The inspection and maintenance work carried out by Golfar For Building Cleaning and Maintenance was top-tier. They identified issues we weren’t even aware of and resolved them quickly and efficiently. Their preventative maintenance plan has already started saving us money. Excellent service!

Operations Manager at Hilton Hotels & Resorts

Ethan Parker

Manager

Liam Bennett

Cleaner

Noah Thompson

Supervisor

James Mitchell

Worker

Lucas Ramirez

Worker